Pick a start date above and we'll work out whether you can enter that day, and where you'd be held up.
7 of 7 days have some unverified fields (10 in total) — expand a day to see which.
Forecast window 11-28 — 12-04
Extrapolated to 2,835 m using the standard −6°C/km lapse rate (higher by 7.3°C). These are estimates, not a measured forecast for that elevation.
Forecast point: Karanga Camp (terrain elevation 4,053 m) · Source: Open-Meteo. Extrapolated to 2,835 m using the standard −6°C/km lapse rate (higher by 7.3°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.
Coldest day Dec 1 (low 9°C, feels like 8°C); wettest day Dec 1 with 7 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.
Basis: Kilimanjaro National Park· publication date not stated
TANAPA does not allow climbing without a guide; guides hold KINAPA permits and assistant guides are provided at a 1:2 ratio.
The current rate page on the TANAPA website still shows the 2023/24 financial year, marked 'Valid until June 2024'; in practice the operator's quote applies.
The Machame Route uses public tented campsites (Machame, Shira, Barranco, Karanga, Barafu, Mweka).
Helicopter or stretcher rescue is charged separately; buy insurance that covers high-altitude rescue.
The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.
You must go through a licensed TANAPA/KINAPA operator; conservation, camping and rescue fees are usually bundled into the trip price and paid by the operator.
The park is open year-round; no closure notices.
The TANAPA website does not publish Machame day-by-day distances or 2026 rates; the 62 km / 7 days figures are from operators.
Places to stay near start/end
OSM data · no prices or ratings
Charter needed: Yes · 6 camps along the route
The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.
If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.
This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).
Low confidence:Total ascent, Total descent — these values are estimated or come from third-party conventions, not published directly by a source.
Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.
Track:Kilimanjaro Machame Route, 62 km; the OSM relation connects only 76% of its ways. Note: this track is solved from waypoints (41 km), 33% shorter than the 62 km on this page. The difference is because this long route is not mapped as a continuous track in OSM, so the solver took the shortest passable network; the track is fine for direction but do not use it as a surveyed distance.
Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.