hikeer
Mount Fuji Yoshida Route
SlopeOne cell per day; colour shows how steep that stretch isSchematic profile · not surveyed terrain
Flat <5%Gentle 5–12%Steep 12–25%Very steep >25%
Mapped track chord 8.7 km · profile stretched to the official 13.8 km distance
2500300035000km5km10kmFuji SubaOriginal Kengamine
No start date yetBest Jul–Aug

Pick a start date above and we'll work out whether you can enter that day, and where you'd be held up.

Key numbers

Distance per official figure
Total distance
13.8km
Track 8.7 km (37% short)
Recorded range
1–2days
Safest to plan for the minimum
Total ascent
+1,471m
Descent −1,471
Max elevation
3,776m
Official figure

Seasons & windows

Best Jul–Aug
1
2
3
4
5
6
7
8
9
10
11
12
Best Jul–AugOpen SepClosed Jan–Jun, Oct–Dec

Photos

6 photos from Wikimedia Commons

Day by day

Click a day to highlight it on the map and profile

1 of 1 days have some unverified fields (2 in total) — expand a day to see which.

Weather & risk

Forecast point Fuji Subaru Line 5th Station

Forecast window 11-28 — 12-04

28
-2°/-14°
9mm
FL -21°
29
-13°/-16°
FL -24°
30
-5°/-13°
FL -22°
1
0°/-7°
FL -14°
2
-4°/-13°
FL -17°
3
-3°/-13°
FL -17°
4
-3°/-11°
1mm
FL -16°

Extrapolated to 3,776 m using the standard −6°C/km lapse rate (lower by 8.9°C). These are estimates, not a measured forecast for that elevation.

Forecast point and method

Forecast point: Fuji Subaru Line 5th Station (terrain elevation 2,293 m) · Source: Open-Meteo. Extrapolated to 3,776 m using the standard −6°C/km lapse rate (lower by 8.9°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.

Risk indicators · 3,776 m

Derived from the forecast, not observed on site
High
Wind chill / hypothermia
Wind chill down to -24°C; wear a windproof layer plus a face mask and gloves throughout
High
Ice / trail surface
Ice may form after precipitation on 1 days; bring crampons
Watch
Snowfall / visibility
Snow possible on 1 days
Low
High wind
Peak wind 20 km/h
How these are calculated: coldest Nov 29 · wettest Nov 28

Coldest day Nov 29 (low -16°C, feels like -24°C); wettest day Nov 28 with 9 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.

Access & permits

Last verified 7 days ago
Seasonally closedClosed Sep 11 – next year Jun 30

Basis: Mt. Fuji Climbing (English)· publication date not stated

Permit needed?
2 items
Cost
¥4,000 per person per climb (required even if you stay at a hut)
Where to apply
Pay online on the Mount Fuji climber reservation site (asoview), or on site at the 5th Station
Climbing fee
Pay the ¥4,000 per-person climbing fee in advance on the Mount Fuji climber reservation site (asoview); a reservation is not mandatory and those without one can pay on site. Huts must be booked separately with each hut.
Requirements & documents (4)
Climbing feeRequiredNotice ↗
Where to apply
Pay online on the Mount Fuji climber reservation site (asoview), or on site at the 5th Station
Processing time
Book before departure recommended; cancelling within two days of the reserved date incurs the full fee
Cost
¥4,000 per person per climb (required even if you stay at a hut)
Documents requiredCredit card
Notes ▾

¥4,000 for the 2026 season; the fee funds safety management and environmental protection.

Entry reservation (optional)Not mandatoryFreeNotice ↗
Where to apply
Mount Fuji climber reservation site (asoview)
Processing time
Can be reserved in advance; without a reservation you can also queue on site
Notes ▾

The official site states clearly that reservation is not mandatory; once the daily cap of 4,000 people is reached the 5th Station gate closes.

Mountain hut bookingNot mandatoryNotice ↗
Where to apply
Individual huts (7th-8th Station)
Processing time
Quotas are tight in season, so book months ahead
Notes ▾

Hut guests may pass through the gate during its 14:00-03:00 closure; there is no accommodation at the summit.

Gear and pledge checkRequiredFreeNotice ↗
Where to apply
Check it yourself before departure, or submit it when reserving
Documents requiredCold-weather clothingWaterproof jacket and trousersHiking bootsHeadlampGloves and hatPlenty of drinking water
Notes ▾

The official site lists 13 items of gear and pledges and prohibits bullet climbing (pushing to the summit overnight without rest).

The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.

Guide No guide neededPack animals You can carry your ownLight pack Full pack throughout
Notice excerpt (prices, penalties and other unstructured details)

Pay the ¥4,000 per-person climbing fee in advance on the Mount Fuji climber reservation site (asoview); a reservation is not mandatory and those without one can pay on site. Huts must be booked separately with each hut.

Why this status · basis and timeline

The 2026 climbing season ended on 10 September; as of 2026-11-21 the official English site states clearly that 'Mt. Fuji is currently closed', and all trails above the 5th Station are closed for winter with no entry.

Additional notes

Outside the climbing season there are no huts, no standing rescue staff and no shuttle buses, and entering is prohibited and extremely dangerous.

Getting there & lodging

3 places to stay
Nearest airport
Tokyo Haneda (HND) / Narita (NRT)
Nearest city
Fujiyoshida / Kawaguchiko
Drive from city
2.5 h
Self-drive
Yes
There is a direct highway bus from Shinjuku to the Fuji Subaru Line 5th Station (about 2.5 hours); you can also take the Fujikyuko Line to Kawaguchiko or Fujisan Station and change to a mountain bus. Parking at the 5th Station is restricted during the climbing season, so use public transport.

Places to stay near start/end

OSM data · no prices or ratings

Charter needed: No · 1 camps along the route

Gear readiness

8 items, 0 of them core safety
0/8
Nothing checked off yet
Checkmarks live only on this device, per routeSafety 0/0
Support gear & consumables8 items

The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.

Field reports

No field reports yet
Field reports · unverifiedNot intelligence, and not added to the sources list

If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.

This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).

How reliable is this?8 sources · verified 7 days ago

Low confidence:access.driveHoursFromCity — these values are estimated or come from third-party conventions, not published directly by a source.

Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.

Track:Fuji Yoshida Route: 6.8 km up + 7 km down

Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.