hikeer
Tahoe Rim Trail
SlopeOne cell per day; colour shows how steep that stretch is
Flat <5%Gentle 5–12%Steep 12–25%Very steep >25%
Mapped track chord 208.4 km · profile stretched to the official 269.9 km distance
2000250030000km30km60km90km120km150km180km210km240kmMiddle VeRichardsoTahoe CitWatson LaGray LakeMarlette 3114m
Accessible · permit neededFrom 2026-07-01 · 20 days

Jul 1 — Jul 20: accessible, with a permit

The whole trip falls within "every year from May 22 to Sep 30": Desolation Wilderness quota season (Friday before Memorial Day – 9/30); overnight stays require a quota permit; the exact start date shifts with Memorial Day.

Best Jul–Sep
Why this verdict (2 reasons)
  • The whole trip falls within "every year from May 22 to Sep 30": Desolation Wilderness quota season (Friday before Memorial Day – 9/30); overnight stays require a quota permit; the exact start date shifts with Memorial Day.
  • Permit: Only the Desolation Wilderness needs a permit. Day permits are free and self-issued at each entrance; overnight stays must be applied for in advance on recreation.gov (permit 233261), up to 6 months ahead. From 2026-03-20 a new TRT Thru-Hike Zone 46 was added, and anyone walking the full loop must select that zone.

Key numbers

Distance per official figure
Total distanceEstimated
269.9km
Track 208.4 km (23% short)
Recorded range
15–20days
Total ascentEstimated
+9,439m
Descent −9,523
Max elevationEstimated
3,114m

Seasons & windows

Best Jul–Sep
1
2
3
4
5
6
7
8
9
10
11
12
Best Jul–SepOpen Jun, Oct

Photos

5 photos from Wikimedia Commons

Day by day

Click a day to highlight it on the map and profile

4 of 4 days have some unverified fields (15 in total) — expand a day to see which.

Weather & risk

Forecast point Tahoe City

Forecast window 11-29 — 12-05· does not cover a trip starting 2026-07-01 — check again 3 days before you go

29
5°/-3°
FL -11°
30
0°/-6°
20mm
FL -16°
1
-4°/-6°
12mm
FL -14°
2
-5°/-7°
3mm
FL -12°
3
-3°/-11°
FL -17°
4
-1°/-9°
FL -14°
5
-3°/-8°
11mm
FL -12°

Extrapolated to 3,114 m using the standard −6°C/km lapse rate (lower by 5.1°C). These are estimates, not a measured forecast for that elevation.

Forecast point and method

Forecast point: Tahoe City (terrain elevation 2,261 m) · Source: Open-Meteo. Extrapolated to 3,114 m using the standard −6°C/km lapse rate (lower by 5.1°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.

Risk indicators · 3,114 m

Derived from the forecast, not observed on site
Watch
Wind chill / hypothermia
Wind chill down to -17°C; watch the wind
Extreme
Ice / trail surface
Precipitation with sub-zero temperatures on 4 days; crampons are required, not optional
High
Snowfall / visibility
Snow possible all day on 4 days; visibility and route-finding on passes will suffer
Watch
High wind
Peak wind 39 km/h
How these are calculated: coldest Dec 3 · wettest Nov 30

Coldest day Dec 3 (low -11°C, feels like -17°C); wettest day Nov 30 with 20 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.

Access & permits

Last verified 7 days ago
OpenPermit required · Desolation Wilderness overnight permit

Basis: Regulations & Permits· publication date not stated

Permit needed?
4 items
Cost
First night $5 per adult, then $10 per night for nights 2–14; $6 reservation fee; free for ages 12 and under
Where to apply
recreation.gov, permit 233261
Desolation Wilderness overnight permit
Only the Desolation Wilderness needs a permit. Day permits are free and self-issued at each entrance; overnight stays must be applied for in advance on recreation.gov (permit 233261), up to 6 months ahead. From 2026-03-20 a new TRT Thru-Hike Zone 46 was added, and anyone walking the full loop must select that zone.
Requirements & documents (4)
Desolation Wilderness overnight permitRequiredNotice ↗
Where to apply
recreation.gov, permit 233261
Processing time
Up to 6 months in advance
Cost
First night $5 per adult, then $10 per night for nights 2–14; $6 reservation fee; free for ages 12 and under
Documents requiredPrinted permitHard-sided bear canister
Notes ▾

The quota season runs from the Friday before Memorial Day to 9/30; maximum $100 per permit; cancellations refunded in full if ≥8 days ahead, not refunded if ≤7 days.

TRT Thru-Hike Overnight Permit (Zone 46)RequiredNotice ↗
Where to apply
recreation.gov 233261, choose Echo Lakes or Richardson as the entrance
Processing time
Permit can be printed 14 days in advance
Cost
Included in the Desolation permit fee
Documents requiredPermitHard-sided bear canister
Notes ▾

Only 10 people per night, with a maximum of 2 nights inside the wilderness; you must camp within 300 ft of the PCT/TRT corridor; camping is prohibited in Zone 33 Lake Aloha.

Hard-sided bear canisterRequiredNotice ↗
Where to apply
Whole route (mandatory since 2024-01)
Cost
Bring your own or rent
Documents requiredHard-sided bear canister
Notes ▾

Soft bags are not accepted; violations can be fined.

California Campfire Permit (stoves)RequiredFreeNotice ↗
Where to apply
readyforwildfire.org
Cost
Free
Documents requiredCampfire Permit
Notes ▾

Required for gas/liquid fuel stoves and expires at year end; open fires are banned on the whole route and wood-burning stoves are banned in the Tahoe Basin.

The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.

Guide No guide neededPack animals —Light pack Full pack throughout
Notice excerpt (prices, penalties and other unstructured details)

Only the Desolation Wilderness needs a permit. Day permits are free and self-issued at each entrance; overnight stays must be applied for in advance on recreation.gov (permit 233261), up to 6 months ahead. From 2026-03-20 a new TRT Thru-Hike Zone 46 was added, and anyone walking the full loop must select that zone.

Why this status · basis and timeline

No closure notice as of 2026-11-21; there is no formal winter closure, but signs are buried in snow and the trail is unmarked, so you must navigate yourself. The Desolation quota season runs from late May to 9/30.

Additional notes

In the Nevada State Park section you may camp only at Marlette Peak, Hobart and North Canyon; Watson Lake is campground-only; camping at trailheads is prohibited.

Getting there & lodging

2 places to stay
Nearest airport
Reno–Tahoe International Airport (RNO)
Nearest city
South Lake Tahoe, CA / Truckee, CA
Drive from city
1 h
Self-drive
Yes
The loop has more than 10 trailheads (Echo Lakes, Barker Pass, Brockway, Spooner, Kingsbury, Mount Rose and others), so you can drive in and out in sections; there is no public transport around the loop.

Places to stay near start/end

OSM data · no prices or ratings

Charter needed: No · 6 camps along the route

Gear readiness

5 items, 0 of them core safety
0/5
Nothing checked off yet
Checkmarks live only on this device, per routeSafety 0/0
Support gear & consumables5 items

The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.

Field reports

No field reports yet
Field reports · unverifiedNot intelligence, and not added to the sources list

If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.

This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).

How reliable is this?8 sources · verified 7 days ago

Low confidence:Distance, Total ascent, Max elevation, Total descent — these values are estimated or come from third-party conventions, not published directly by a source.

Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.

Track:Track from an externally downloaded file, tahoe-rim-trail.gpx (official/open-data channel), not assembled from OSM relations. The file totals 269.9 km, thinned to 400 points for drawing; elevation taken from Copernicus/SRTM DEM.

Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.