hikeer
Routeburn Track
SlopeOne cell per day; colour shows how steep that stretch is
Flat <5%Gentle 5–12%Steep 12–25%Very steep >25%
Mapped track chord 29.3 km · profile stretched to the official 33.1 km distance
500750100012500km10km20km30kmRouteburnLake Mack1321m
Accessible · permit neededFrom 2026-02-01 · 4 days

Feb 1 — Feb 4: accessible, with a permit

This route requires extra paperwork to enter.

Best Jan–Mar
Why this verdict (2 reasons)
  • This route requires extra paperwork to enter.
  • Permit: Book at bookings.doc.govt.nz; stays for the 2026/27 season (2026-07-01 to 2027-06-30) open on 2026-05-15 at 09:30, and peak-season bunks often sell out early.

Key numbers

Distance per official figure
Total distance
33.1km
Track 29.3 km (12% short)
Recorded range
2–4days
Safest to plan for the minimum
Total ascentEstimated
+1,359m
Descent −1,422
Max elevation
1,255m

Seasons & windows

Best Jan–Mar
1
2
3
4
5
6
7
8
9
10
11
12
Best Jan–MarOpen Apr, Nov–Dec

Photos

6 photos from Wikimedia Commons

Day by day

Click a day to highlight it on the map and profile

3 of 3 days have some unverified fields (9 in total) — expand a day to see which.

Weather & risk

Forecast point Trailhead

Forecast window 11-28 — 12-04· does not cover a trip starting 2026-02-01 — check again 3 days before you go

28
17°/3°
FL 0°
29
9°/5°
5mm
FL 1°
30
11°/0°
46mm
FL -4°
1
5°/-1°
5mm
FL -5°
2
8°/2°
6mm
FL -2°
3
10°/7°
38mm
FL 4°
4
14°/8°
24mm
FL 5°

Extrapolated to 1,255 m using the standard −6°C/km lapse rate (lower by 4.3°C). These are estimates, not a measured forecast for that elevation.

Forecast point and method

Forecast point: Trailhead (terrain elevation 538 m) · Source: Open-Meteo. Extrapolated to 1,255 m using the standard −6°C/km lapse rate (lower by 4.3°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.

Risk indicators · 1,255 m

Derived from the forecast, not observed on site
Low
Wind chill / hypothermia
Wind chill down to -5°C
High
Ice / trail surface
Ice may form after precipitation on 1 days; bring crampons
Low
Snowfall / visibility
No clear snowfall signal in the forecast period
Low
High wind
Peak wind 20 km/h
How these are calculated: coldest Dec 1 · wettest Nov 30

Coldest day Dec 1 (low -1°C, feels like -5°C); wettest day Nov 30 with 46 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.

Access & permits

Last verified 7 days ago
Open

Basis: Fees and bookings – Routeburn Track· publication date not stated

Permit needed?
1 items
Cost
Peak-season hut NZ$88 per adult per night (NZ$132 for international visitors); campsite NZ$28 (NZ$42)
Where to apply
bookings.doc.govt.nz
Great Walk peak-season lodging booking
Book at bookings.doc.govt.nz; stays for the 2026/27 season (2026-07-01 to 2027-06-30) open on 2026-05-15 at 09:30, and peak-season bunks often sell out early.
Requirements & documents (2)
Great Walk peak-season lodging bookingRequiredFreeNotice ↗
Where to apply
bookings.doc.govt.nz
Processing time
Opens 2026-05-15 09:30; book on opening day in peak season
Cost
Peak-season hut NZ$88 per adult per night (NZ$132 for international visitors); campsite NZ$28 (NZ$42)
Restrictions
Children 5-17 half price; 0-4 free
Documents requiredTrip datesNumber of peopleBooking confirmation and ID, checked on arrival
Notes ▾

Without a valid booking you may be fined or refused entry.

Backcountry Hut Ticket/Pass (off-season only)Not mandatoryNotice ↗
Where to apply
Buy at a DOC visitor centre or online
Cost
Hut NZ$35 in May-June; NZ$30 July-October; campsite NZ$10
Notes ▾

No booking needed 5/1-10/31, first come first served; the Backcountry Hut Pass does not apply in Great Walk season.

The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.

Guide No guide neededPack animals —Light pack Yes (pack animals/lodges)
Notice excerpt (prices, penalties and other unstructured details)

Book at bookings.doc.govt.nz; stays for the 2026/27 season (2026-07-01 to 2027-06-30) open on 2026-05-15 at 09:30, and peak-season bunks often sell out early.

Why this status · basis and timeline

Open as normal in the 2026/27 Great Walks season (2026-11-01 to 2027-04-30), with lodging bookings open; in winter it is outside the Great Walk season but the trail is not closed.

Additional notes

Unlike the Milford Track: the Routeburn can be walked in either direction, both ends are reachable by road, camping is allowed, and it is usually 3 days and 2 nights; the Milford is one-way, 4 days and 3 nights, bans camping and needs a boat at both ends, with peak-season huts at NZ$106 (NZ$152 for international visitors).

Getting there & lodging

4 places to stay
Nearest airport
—
Nearest city
Queenstown / Te Anau
Drive from city
—
Self-drive
Yes
Routeburn Shelter is 25 km from Glenorchy (part gravel road); The Divide is 85 km from Te Anau; the two ends are 325 km apart, so arrange a shuttle or vehicle at both ends; do not walk in the dark.

Places to stay near start/end

OSM data · no prices or ratings

Charter needed: Yes · 2 camps along the route

Gear readiness

9 items, 0 of them core safety
0/9
Nothing checked off yet
Checkmarks live only on this device, per routeSafety 0/0
Support gear & consumables9 items

The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.

Field reports

No field reports yet
Field reports · unverifiedNot intelligence, and not added to the sources list

If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.

This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).

How reliable is this?11 sources · verified 7 days ago
Show 8 more sources

Low confidence:Total ascent, Total descent — these values are estimated or come from third-party conventions, not published directly by a source.

Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.

Track:The OSM relation 'GW - 06 Routeburn Track' is fully connected (60/60 ways), measured length 31.5 km (DOC publishes 32 km). (Distance, ascent and max elevation derived from DEM resampled every 100 m along the track)

Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.