hikeer
John Muir Trail
SlopeOne cell per day; colour shows how steep that stretch is
Flat <5%Gentle 5–12%Steep 12–25%Very steep >25%
Mapped track chord 258.2 km · profile stretched to the official 340 km distance
10002000300040000km30km60km90km120km150km180km210km240km270km300km330km4355m
Accessible · permit neededFrom 2026-12-12 · 25 days

Dec 12 — Jan 5: accessible, with a permit

This route requires extra paperwork to enter.

Why this verdict (2 reasons)
  • This route requires extra paperwork to enter.
  • Permit: Yosemite Wilderness Permit (southbound full JMT) / Inyo National Forest Wilderness Permit (northbound from Whitney Portal)

Key numbers

Distance per official figure
Total distance
340km
Track 258.2 km (24% short)
Recorded range
18–25days
Total ascentEstimated
+15,228m
Descent −12,002
Max elevation
4,421m
High altitude · acclimatise

Seasons & windows

1
2
3
4
5
6
7
8
9
10
11
12
Open Jul–Sep

Photos

6 photos from Wikimedia Commons

Day by day

Click a day to highlight it on the map and profile

Day-by-day itinerary not verified yet.

Weather & risk

Forecast point Trailhead

Forecast window 11-28 — 12-04· does not cover a trip starting 2026-12-12 — check again 3 days before you go

28
-1°/-7°
FL -13°
29
1°/-9°
FL -16°
30
-7°/-11°
17mm
FL -17°
1
-7°/-15°
5mm
FL -21°
2
-11°/-16°
3mm
FL -24°
3
-5°/-14°
FL -22°
4
-4°/-11°
FL -17°

Extrapolated to 4,421 m using the standard −6°C/km lapse rate (lower by 19.1°C). These are estimates, not a measured forecast for that elevation.

Forecast point and method

Forecast point: Trailhead (terrain elevation 1,236 m) · Source: Open-Meteo. Extrapolated to 4,421 m using the standard −6°C/km lapse rate (lower by 19.1°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.

Risk indicators · 4,421 m

Derived from the forecast, not observed on site
High
Wind chill / hypothermia
Wind chill down to -24°C; wear a windproof layer plus a face mask and gloves throughout
Extreme
Ice / trail surface
Precipitation with sub-zero temperatures on 3 days; crampons are required, not optional
High
Snowfall / visibility
Snow possible all day on 3 days; visibility and route-finding on passes will suffer
Low
High wind
Peak wind 17 km/h
How these are calculated: coldest Dec 2 · wettest Nov 30

Coldest day Dec 2 (low -16°C, feels like -24°C); wettest day Nov 30 with 17 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.

Access & permits

Last verified 7 days ago
Open

Basis: Current Conditions· publication date not stated

Permit needed?
2 items
Cost
Lottery application fee US$10 per request; US$5/person after winning (fees listed on the NPS page).
Where to apply
Recreation.gov (Yosemite Wilderness Permits)
Yosemite Wilderness Permit (southbound full JMT)
Yosemite Wilderness Permit (southbound full JMT) / Inyo National Forest Wilderness Permit (northbound from Whitney Portal)
Requirements & documents (2)
Yosemite Wilderness Permit (southbound full JMT)RequiredFreeNotice ↗
Where to apply
Recreation.gov (Yosemite Wilderness Permits)
Processing time
60% of quota by weekly lottery 24 weeks ahead (apply Sunday-Saturday, results Monday, accept and pay by 23:59 Thursday); 40% seven days ahead at 07:00 PDT, first come first served; lottery season mid-November to early May, covering May-October trips only.
Cost
Lottery application fee US$10 per request; US$5/person after winning (fees listed on the NPS page).
Notes ▾

Per the NPS JMT page: 'If you plan to hike the John Muir Trail (JMT) as a continuous hike, you only need one wilderness permit from Yosemite for the entire trip (you do not need a "Whitney stamp" or permits from other national forests or national parks).' The two full JMT entries: "Happy Isles to Past LYV (Donohue Pass eligible)" and "Lyell Canyon (Donohue Pass eligible)". NPS also states the Donohue Pass exit quota of 45 people/day: Happy Isles 15, Lyell Canyon 30, and the first night out of Happy Isles may not be spent camped in Little Yosemite Valley.

Inyo National Forest Wilderness Permit (northbound from Whitney Portal)RequiredNotice ↗
Where to apply
Recreation.gov (Inyo National Forest Wilderness Permits)
Processing time
60% released 6 months ahead daily at 07:00 PST; 40% released 2 weeks ahead the same day; permits required year-round.
Cost
Reservation fee US$6/order; Whitney Zone US$15/person; other zones US$5/person.
Notes ▾

Per the Recreation.gov Inyo NF permit page: permits are required year-round; '60%… six months in advance… 40%… two weeks in advance'; fees $6/order + Whitney Zone $15/person or $5/person; itineraries ending at Mt Whitney (Whitney Portal) must list the exit as 'Mt Whitney (Trail Crest Exit)'. Starting northbound from Whitney Portal is under Inyo jurisdiction, so this permit is required rather than a Yosemite one.

The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.

Guide No guide neededPack animals —Light pack Full pack throughout
Notice excerpt (prices, penalties and other unstructured details)

Yosemite Wilderness Permit (southbound full JMT) / Inyo National Forest Wilderness Permit (northbound from Whitney Portal)

Why this status · basis and timeline

Fetched NPS Yosemite current conditions page 2026-11-21: Tioga Road is 'Closed for the season due to snow'; trails not listed 'may be snowy and very difficult to find from about November through May/June'. The JMT's high sections are already in winter conditions; wilderness permits are still required year-round, but from November to April they can be obtained at the issuing station the day before or the day of departure.

Getting there & lodging

6 places to stay
Nearest airport
—
Nearest city
Lone Pine (nearest town to the south end; NPS text: 'the nearest town to Mount Whitney'); Yosemite Valley (north end)
Drive from city
—
Self-drive
—
North end: YARTS Highway 120 East from Mammoth Lakes to Yosemite Valley; south end: Eastern Sierra Transit from Lone Pine to Mammoth Lakes. There is no public transport between Whitney Portal and Yosemite. Based on the NPS JMT page: 'There is no public transportation available between Whitney Portal and Yosemite, the southern and northern terminuses of the John Muir Trail. However, Eastern Sierra Transit provides bus service from Lone Pine… to Mammoth Lakes.…'

Places to stay near start/end

OSM data · no prices or ratings

Gear readiness

9 items, 0 of them core safety
0/9
Nothing checked off yet
Checkmarks live only on this device, per routeSafety 0/0
Support gear & consumables9 items

The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.

Field reports

No field reports yet
Field reports · unverifiedNot intelligence, and not added to the sources list

If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.

This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).

How reliable is this?9 sources · verified 7 days ago

Low confidence:Total ascent, Total descent — these values are estimated or come from third-party conventions, not published directly by a source.

Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.

Track:OSM relation 'John Muir Trail': 94/94 ways fully connected, measured length 335.8 km (commonly about 340 km). (Distance/ascent/max elevation derived from DEM resampled every 100 m along the track.)

Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.