Jun 1 — Jun 2: accessible, with a permit
The whole trip falls within "every year from May 22 to Oct 15": A Half Dome permit is required every day while the cables are up, with a daily cap of 300 checked at the base of Sub Dome.
1 of 2 days have some unverified fields (2 in total) — expand a day to see which.
Forecast window 11-28 — 12-04· does not cover a trip starting 2026-06-01 — check again 3 days before you go
Extrapolated to 1,850 m using the standard −6°C/km lapse rate (lower by 3.7°C). These are estimates, not a measured forecast for that elevation.
Forecast point: Happy Isles Trailhead (terrain elevation 1,236 m) · Source: Open-Meteo. Extrapolated to 1,850 m using the standard −6°C/km lapse rate (lower by 3.7°C) — real mountain lapse rates vary with inversions, aspect and cloud cover, so this may deviate. Precipitation is not extrapolated.
Coldest day Dec 2 (low -1°C, feels like -6°C); wettest day Nov 30 with 15 mm.These indicators decide whether to pack an extra layer, not whether to go — for the final call, trust on-the-ground weather and your guide.
Basis: Current Conditions - Yosemite National Park· publication date not stated
The permit holder or alternate must be present with photo ID and the confirmation email; permits are non-transferable.
Only needed for overnight: staying in Little Yosemite Valley requires a wilderness permit, with the Half Dome add-on requested on the Wilderness Permit.
The items above are what the official notice states explicitly. Fields marked “unverified” were not covered by the text — which usually means the process itself is opaque. Always confirm with the relevant authority before you set out.
A permit is required every day while the cables are up (including day hikes). The daily cap is 300 people (about 225 day hikers + 75 backpackers), checked at the base of Sub Dome. Two routes: (1) presale lottery 3/1-3/31 (Eastern Time), results in mid-April; (2) daily lottery applied 2 days ahead (00:00-16:00 PT), notified that evening. Backpackers (including overnight at LYV) apply with their wilderness permit.
NPS current conditions page: the Half Dome cables are down for the season and the cable section cannot be climbed; Four Mile Trail is closed due to danger near Union Point, and Glacier Point Road is seasonally closed.
A permit is still required after the cables come down, but the climb is then exposed granite requiring rope and climbing experience, which is outside hiking.
Places to stay near start/end
OSM data · no prices or ratings
Charter needed: No · 2 camps along the route
The categories are our own general-practice grouping — not an official requirement. Checkmarks live only on this device, per route.
If you have hiked this route, leave a field report — its days and distance are reconciled against the library automatically.
This route is open; field reports default to public (photos still have location data stripped).Photos always have location data stripped (phone photos carry GPS by default, which would publish your exact coordinates).
Low confidence:Distance, Total ascent, Max elevation, altitudeProfile, Total descent — these values are estimated or come from third-party conventions, not published directly by a source.
Disclaimer:Every verdict on this page is a structured summary of public sources. It is not an official publication and does not grant access. Fields marked unverified mean we could not find a reliable source — do not read that as 'no problem'Access status changes; check the official notice again before you go.
Track:The track comes from an external download, half-dome.gpx (official/open-data channel), not from stitching OSM relations. It totals 24.4 km in the file and is thinned to 398 points for drawing; elevation is taken from Copernicus/SRTM DEM.
Tracks and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM; base-map credits follow the active layer (OpenTopoMap / Esri), as shown in the © notice at the map's bottom right.