The most popular climbing route on Japan's highest peak: 6.8 km one way from the 5th Station to the summit, open only in summer.
Japan · North slope of Mount Fuji, Yoshida trailhead (Fuji Subaru Line 5th Station) · Out-and-back · Planned start 2027-07-01
The whole trip falls within "every year from Jul 1 to Sep 10": During the season the 5th Station gate is controlled: closed 14:00-03:00 (except for hut guests), with a daily cap of 4,000 people and a ¥4,000 climbing fee.; The whole trip falls within "every year from Jul 1 to Sep 10": High-altitude cold, strong wind and altitude sickness; the official rules prohibit bullet climbing and require 13 items of gear.; Permit: Pay the ¥4,000 per-person climbing fee in advance on the Mount Fuji climber reservation site (asoview); a reservation is not mandatory and those without one can pay on site. Huts must be booked separately with each hut.
The track uses an equidistant projection (cos correction at the mid latitude of 35.38°, equal scale in every direction), scale bar 1 km; the profile shares the same 14 km distance axis with the track.
The track is straight lines between waypoints — for orientation only; never navigate by it. Terrain elevation is sampled from Copernicus DEM; this profile is schematic and does not represent surveyed terrain peaks (Track and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © SRTM 30m (opentopodata.org)).
| Day | Distance | Ascent | Day's max | Camp elevation | Campsite |
|---|---|---|---|---|---|
| D1 | 13.8 | 1471m | 3,776m | — | — |
— means this field is unverified (not zero, and not “none”).
| Climbing feeRequired | Where: Pay online on the Mount Fuji climber reservation site (asoview), or on site at the 5th Station · Cost: ¥4,000 per person per climb (required even if you stay at a hut) · Lead time: Book before departure recommended; cancelling within two days of the reserved date incurs the full fee · Materials: Credit card ¥4,000 for the 2026 season; the fee funds safety management and environmental protection. |
| Entry reservation (optional)Not mandatoryFree | Where: Mount Fuji climber reservation site (asoview) · Lead time: Can be reserved in advance; without a reservation you can also queue on site The official site states clearly that reservation is not mandatory; once the daily cap of 4,000 people is reached the 5th Station gate closes. |
| Mountain hut bookingNot mandatory | Where: Individual huts (7th-8th Station) · Lead time: Quotas are tight in season, so book months ahead Hut guests may pass through the gate during its 14:00-03:00 closure; there is no accommodation at the summit. |
| Gear and pledge checkRequiredFree | Where: Check it yourself before departure, or submit it when reserving · Materials: Cold-weather clothing, Waterproof jacket and trousers, Hiking boots, Headlamp, Gloves and hat, Plenty of drinking water The official site lists 13 items of gear and pledges and prohibits bullet climbing (pushing to the summit overnight without rest). |
Closed Sep 11 – next year Jun 30
Ground transport: There is a direct highway bus from Shinjuku to the Fuji Subaru Line 5th Station (about 2.5 hours); you can also take the Fujikyuko Line to Kawaguchiko or Fujisan Station and change to a mountain bus. Parking at the 5th Station is restricted during the climbing season, so use public transport.
Places to stay near the start/end (OSM, no prices or reviews): Start 0.0km Fujikyu Unjokaku (Guesthouse / B&B); Start 1.5km Sato-goya Hut (Guesthouse / B&B); Start 2.0km Hana-goya Hut (Mountain hut)