← Back to the routePress ⌘P / Ctrl+P to save as PDF. This page is laid out for paper: no interactive controls and no online map. Page numbers and the generation date live in the print margins — enable “Headers and footers” in the print dialog to see them.
Daisetsuzan: Asahidake–Kurodake Traverse
From Hokkaido's highest summit at 2,291 m, across Ohachidaira to Kurodake: an autumn-colour ridge walk over 2 days and 1 night
Japan · Asahidake, Higashikawa, Kamikawa District / Sounkyo, Kamikawa, Kamikawa District · Traverse · Planned start 2026-12-28
⚠ Verdict for your start date: Dec 28 — Dec 29: accessible, with known hazards2026.12.28 – 2026.12.29 · 2 days
The whole trip falls within "every year from Nov 1 to May 31": Snow season. Snowfields linger on the ridge, and it is dangerous without crampons and an ice axe.
Distance
13.4 km
Days
2 days
Total ascent
1,292 m
Max elevation
2,291m
Track and terrain
The track uses an equidistant projection (cos correction at the mid latitude of 43.69°, equal scale in every direction), scale bar 2 km; the profile shares the same 13 km distance axis with the track.
— means this field is unverified (not zero, and not “none”).
Permits and accessOpen
Unverified.
Gear list
☐Hiking boots
☐Insulation
☐Rain gear
☐ヘッドランプ
☐Packable toilet
☐Bear bell
Escape and communication
Escape routes: Descend from Kurodake Hut to the Kurodake Ropeway 5th Station; On the Asahidake side, turn back to Sugatami Station; Exit to Sounkyo via Hakuundake shelter
Mobile signal: Much of the ridge has no coverage (unverified).
Guide: No guide needed
Nearest city: Asahikawa
Nearest airport: Asahikawa Airport
Nearest hospital, Satellite communicator: unverified — we could not find a reliable source, which does not mean “no risk”.
Ground transport: By car it is about 1 h 30 min from Asahikawa to the Asahidake Ropeway, and about 1 h 40 min to Sounkyo. The Asahidake Ropeway runs to Sugatami Station at 1,600 m, return ¥3,500 (6/1–10/31). The Kurodake Ropeway runs from Sounkyo Station at 670 m to the 5th Station at 1,300 m in about 7 minutes, with a chairlift on to 1,520 m.
Places to stay near the start/end (OSM, no prices or reviews): Start 0.7km Ura-Asahi designated campsite (Camp); End 1.7km Sounkyo Campground (Camp); End 1.7km Sounkyo Onsen Yumoto Ginsenkaku (Hotel); End 1.8km Resort Pension Yama no Ue (Guesthouse)