From Hokkaido's highest summit at 2,291 m, across Ohachidaira to Kurodake: an autumn-colour ridge walk over 2 days and 1 night
Japan · Asahidake, Higashikawa, Kamikawa District / Sounkyo, Kamikawa, Kamikawa District · Traverse · Planned start 2026-08-01
The whole trip falls within "every year from Jun 1 to Oct 31": Brown bear advisory. Hokkaido issued a warning on 2026-07-07.
The track uses an equidistant projection (cos correction at the mid latitude of 43.69°, equal scale in every direction), scale bar 2 km; the profile shares the same 13 km distance axis with the track.
The track is straight lines between waypoints — for orientation only; never navigate by it. Terrain elevation is sampled from Copernicus DEM; this profile is schematic and does not represent surveyed terrain peaks (Track and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © SRTM 30m (opentopodata.org)).
| Day | Distance | Ascent | Day's max | Camp elevation | Campsite |
|---|---|---|---|---|---|
| D1 | — | — | 2,291m | — | Kurodake Hut |
| D2 | — | — | 1,984m | — | — |
— means this field is unverified (not zero, and not “none”).
Unverified.
Nearest hospital, Satellite communicator: unverified — we could not find a reliable source, which does not mean “no risk”.
Ground transport: By car it is about 1 h 30 min from Asahikawa to the Asahidake Ropeway, and about 1 h 40 min to Sounkyo. The Asahidake Ropeway runs to Sugatami Station at 1,600 m, return ¥3,500 (6/1–10/31). The Kurodake Ropeway runs from Sounkyo Station at 670 m to the 5th Station at 1,300 m in about 7 minutes, with a chairlift on to 1,520 m.
Places to stay near the start/end (OSM, no prices or reviews): Start 0.7km Ura-Asahi designated campsite (Camp); End 1.7km Sounkyo Campground (Camp); End 1.7km Sounkyo Onsen Yumoto Ginsenkaku (Hotel); End 1.8km Resort Pension Yama no Ue (Guesthouse)