A multi-pass traverse in the Baima Snow Mountain reserve: crossing passes at the 4,700 m level, through primeval forest and alpine pastures to the G214 tunnel mouth.
Yunnan · Diqing Tibetan Autonomous Prefecture, Deqin County (Hongpo Village in Yunling Township to Shusong Village in Benzilan Town; the Baima Snow Mountain National Nature Reserve spans Deqin and Weixi counties) · Traverse · Planned start 2026-12-12
The whole trip falls within "from Feb 12, 2026 (reopening not announced)": The old Baima Snow Mountain road (old National Highway 214, from the Kongqueshan tunnel junction to the Kongqueshan pass) and the Deqin section of the Degong highway have been closed since 2026-02-12 because of winter cold, rain and snow, severe snow and ice and a partly collapsed roadbed, with passage to be announced: entering or leaving by that road, or descending that way, is not possible. This is a road closure and a separate matter from the reserve's standing ban on entry.; The official notice closes the whole route to entry — this is not a seasonal closure, so changing dates does not help, and older trip reports do not mean it is allowed now.
The track uses an equidistant projection (cos correction at the mid latitude of 28.29°, equal scale in every direction), scale bar 5 km; the profile shares the same 48 km distance axis with the track.
The track is straight lines between waypoints — for orientation only; never navigate by it. Terrain elevation is sampled from Copernicus DEM; this profile is schematic and does not represent surveyed terrain peaks (Track and waypoints © OpenStreetMap contributors (ODbL); terrain elevation © Open-Meteo / Copernicus DEM).
| Day | Distance | Ascent | Day's max | Camp elevation | Campsite |
|---|---|---|---|---|---|
| D1 | 10 | — | 4,518m | 3,981m | Camp by the Juniang River (the record calls it 'the five-star camp of day one'; it has no official name) |
| D2 | 11 | — | 4,668m | 3,999m | Pasture camp by the Pujin River (the record says 'day two pasture camp, by the Pujin River') |
| D3 | 12 | — | 4,760m | 4,007m | Third-day pasture camp by the Pujin River (re-pitched after turning back) |
| D4 | 14 | — | 4,008m | — | None (exit day: Baima Snow Mountain No. 3 Tunnel, then a taxi back to Deqin) |
— means this field is unverified (not zero, and not “none”).
| Approval to enter the Baima Snow Mountain National Nature Reserve (core, buffer or experimental zone)Required | Where: Yunnan Baima Snow Mountain National Nature Reserve Management Bureau (the core zone requires approval from the provincial government department in charge of nature reserves) The legal route is open only to statutory special purposes such as scientific research, ecological monitoring, cultural relic protection and emergency rescue; as of 2026-10-05 no public, workable channel, process or document list for ordinary hikers was found. Entering without approval can be fined 100-5,000 yuan. |
| Ban on entry to the whole area (including the U-shaped valley and Hongpo pass on this route)Required | — Notice of 2026-01-14 from the Deqin branch: every area legally designated in the reserve (core, buffer and experimental zones) is under strict control, and without approval no unit or individual may enter without permission; the points on this route are named individually. |
Guide: unverified — we could not find a reliable source, which does not mean “no risk”.
Ground transport: Start side: Hongpo Village is in Yunling Township, Deqin County; the road from Deqin county town to Hongpo is a township road, roughly 0.5 hours (deriveHoursFromCity uses 0.5, the shortest leg from the hub city to the trailhead; driving from Shangri-La airport straight to the trailhead is another 3.5-4 hours, and this data set could not confirm the exact value). Reverse entrance: the one-and-a-half-day route recorded by Diqing Daily on 2020-07-14 ('Hiking the Baima Snow Mountain U-shaped valley') is 'drive about two and a half hours from Shangri-La county town to Baima Snow Mountain. Get off at the exit of Baima Snow Mountain Tunnel No. 2', park at the G214 tunnel mouth, descend the gravel road into the U-shaped valley, stay a night at Quzonggong monitoring station, and return the next day at the first pasture (4,100 m). Finish side: the official route ends at the Baima tunnel mouth / National Highway 214; the November 2025 record actually finished at Baima Snow Mountain No. 3 Tunnel (3,976 m) and took a taxi back to Deqin. selfDriveOk left blank: the road itself is drivable (tourists often drive the G214 Baima section), but start and finish do not coincide and the reserve is currently closed to entry, so with no source saying whether driving to the trailhead and parking is allowed, this data set does not judge it. charterNeeded=true: there is no public transport between start and finish, and both entry and exit need a charter car or taxi (the record says 'took a taxi back to Deqin'). Note also: a February 2026 notice from the Deqin County Work Safety Committee Office has closed the old Baima Snow Mountain road (old National Highway 214) and the Deqin section of the Degong highway because of winter snow and ice and a partly collapsed roadbed, with reopening to be announced, so entering or leaving by the old road is currently not possible.
Places to stay near the start/end (OSM, no prices or reviews): Finish 5.3km Shusong Dianzang Guesthouse (Guesthouse / B&B)